Table of contents

Share

Time Lapse Video – 90′ Double Girder Crane Installation

A time lapse video from multiple perspectives of the installation of an 90 ft. double girder crane in Pennsylvania with the use of a Versa-Lift 60/80 (full counterweight), 10,000 lbs. telehandler, 8,000 lbs. forklift, an 80 ft. man lift, a 32 ft. scissor lift and 3 tower sections.

Time Lapse Video – Rigging DistillationTime Lapse Video - Rigging Distillation Module with 300T Gantry
Time Lapse – 632 Ton SchulerTime Lapse Video - 632 Ton Schuler Hydraulic Press Layover

Time Lapse Video – 90′ Double Girder Crane Installation

A time lapse video from multiple perspectives of the installation of an 90 ft. double girder crane in Pennsylvania with the use of a Versa-Lift 60/80 (full counterweight), 10,000 lbs. telehandler, 8,000 lbs. forklift, an 80 ft. man lift, a 32 ft. scissor lift and 3 tower sections.

Share

Time Lapse Video – Rigging DistillationTime Lapse Video - Rigging Distillation Module with 300T Gantry
Time Lapse – 632 Ton SchulerTime Lapse Video - 632 Ton Schuler Hydraulic Press Layover

Stay in the loop

Subscribe to our free newsletter.