Time Lapse Video – Rigging Distillation Module with 300T Gantry
Erecting one of two, prefabricated distillation column modules in a pharmaceutical facility. Each module, at 13’x14’x34’ long and weighing 58,000 lb. each, was brought in on its side and uprighted within a zero-overhead clearance environment using 300 Ton hydraulic gantry system at full extension.