Table of contents

Share

Time Lapse Video – Rigging Distillation Module with 300T Gantry

Erecting one of two, prefabricated distillation column modules in a pharmaceutical facility.  Each module, at 13’x14’x34’ long and weighing 58,000 lb. each, was brought in on its side and uprighted within a zero-overhead clearance environment using 300 Ton hydraulic gantry system at full extension.

Turn-key rigging solutions for Yankee Dryer being hoisted up through the roofTime Lapse Video - Removal of a 170,000 lb. Yankee Dryer
Time Lapse – 90′ Double GirderTime Lapse Video - 90' Double Girder Crane Installation

Time Lapse Video – Rigging Distillation Module with 300T Gantry

Erecting one of two, prefabricated distillation column modules in a pharmaceutical facility.  Each module, at 13’x14’x34’ long and weighing 58,000 lb. each, was brought in on its side and uprighted within a zero-overhead clearance environment using 300 Ton hydraulic gantry system at full extension.

Share

Turn-key rigging solutions for Yankee Dryer being hoisted up through the roofTime Lapse Video - Removal of a 170,000 lb. Yankee Dryer
Time Lapse – 90′ Double GirderTime Lapse Video - 90' Double Girder Crane Installation

Stay in the loop

Subscribe to our free newsletter.